Santosh Karkhanis

SAP and Project Management Guru

  • Increase font size
  • Default font size
  • Decrease font size

Just In Time - JIT - Elements of JIT Production

E-mail Print PDF
Article Index
Just In Time - JIT
Unlearning Old Beliefs
Continuous Improvement
Elements of JIT Production
Steps in Implementing JIT Manufacturing
All Pages

ELEMENTS OF JIT PRODUCTION
An overview of JIT production can be gained by understanding the following outline of key elements of JIT strategy.
1. Policies: to provide direction, and to indicate to the work for that management is concerned and involved; cover a wide range of subjects: customer service, elimination of waste, continual improvements, lead time reduction.
2. The people strategy: Positive attitude towards workforce; treating people as company’s valuable asset; Employment as a long term decision; employee involvement, flexibility, small-group improvement activities (SGIA); company unions.
3. The Product Strategy: The design 'quality; integration of product design with manufacturing and-vendor capabilities; role of CAD/CAM configuration control and standardization, grouping products; by families for production through group technology.
4. The plant and equipment strategy: Concepts of focused factories, group layouts, quick conveyance means such as belt conveyor, chute, fork lift; productive maintenance.
5. The process Strategy: Shojinka (flexibility of process in meeting demand)'through GT layout, multifunction work force and job rotation; autonomation (autonomous control of defects), statistical control of defects, set up time reduction, small lot production; achieving balanced production add uniform plant loads through standard operations and mixed model assembly and fabrication.
6. The Planning Strategy: The three month horizon, production plan leveling, Final assembly scheduling (daily buckets) and sequencing.
7. The production scheduling strategy: The Kanbansystem, the role of kanban in achieving improvement activities; produce to exact demand; no contingencies) whirling round tour system.
8. The purchasing strategy: The long-term supplier relations, the subcontractor networks; the transport innovations.



Last Updated on Wednesday, 14 October 2009 16:04  
Share on facebook